We are remodeling our master shower. The remodel was much needed because the shower pan had given out and water was slowly leaking into our basement. Also, when the workers came to demolish it, one of them said, "I can't believe we are actually able to stand on this floor. We should just fall straight through." AND, they found some termites (not too bad though). So, as you can understand, it was definitely time for a new shower. Below are pictures of the progression of the work on the shower:
Before (looks innocent - don't fall for it!)

Dry rot and termites - yummy!

All better now! Patched up a ready to build the bench seat.

Pipes for shower head and control moved to its new position.

Waterproof backing, very important and very special, from Germany!

The tiling begins...

The finished product!!!

with a HUGE bench!!!
(pay no attention to the power drill)

No comments:
Post a Comment